Cameron Facilities / Strata Guides / End of lease make good checklist for Perth offices
Guides for office tenants

End of lease make good checklist for Perth offices

Make good is the work your lease requires before you hand an office back: usually removing signage and tenant fixtures, patching and repairing, repainting, cleaning carpets and floors, and a full clean. Start with the make good clause in your lease, agree the scope with your landlord in writing, and finish the work before the lease ends.

By Cameron Facilities, Mount Lawley, Perth WA. Published 19 November 2026.

Make good often leads to confusion and disputes between commercial tenants and landlords. The Small Business Development Corporation, the State Government agency that gives free advice to small businesses, says the make good clause in your lease outlines the condition the premises must be in when the lease comes to an end, and recommends that you refer to the lease, be proactive, and communicate regularly with records in writing (SBDC(opens in a new tab)). This checklist turns that advice into a plan.

Start with the lease

Read the make good clause, the schedule of fixtures and fittings, and any condition report or photos from when you moved in. Then answer these questions in writing:

  • Does the lease require the premises back as they were before your fit out, or in their current condition, fair wear and tear excepted?
  • Which fixtures and fittings belong to the landlord and stay, and which are yours to remove?
  • Does the lease require repainting regardless of condition? Many do.
  • Are partitions, ceilings, floor coverings or cabling you installed to be removed, or would the landlord rather keep them?
  • Who gives final sign off: the landlord or the agent?
  • When does the lease actually end, and is there any holdover or extension?

If you have made improvements, the SBDC recommends talking to the landlord first to clarify what, if anything, they want kept, and getting that agreement in writing. Giving a date for their reply in your request helps keep things moving.

A make good timeline

  1. Three months out

    Read the lease, find the move in condition report, and ask the landlord in writing what must be removed and what can stay.

  2. Two months out

    Walk the premises with your make good contractor, agree the scope against the lease and get a fixed written quote.

  3. Six weeks out

    Book the work in order: removals, then repairs and patching, then painting, then carpets and the final clean.

  4. Final fortnight

    Finish the work, take dated photos of every room, and book the final inspection with the landlord or agent.

Do the work during the term of the lease. The SBDC warns that works carried out after the lease ends can lead to disputes about when the lease actually ended, and the landlord may charge additional rent and outgoings as well as making good at your cost.

Room by room make good checklist

Walls and ceilings

  • Signage, screens, whiteboards, shelving and wall fixings removed
  • Holes and fixing points patched and sanded
  • Damaged or stained ceiling tiles replaced to match
  • Walls, ceilings, doors and trims repainted if the lease requires it

Floors

  • Carpets professionally cleaned, with stains treated
  • Hard floors cleaned and any damage repaired
  • Floor coverings you installed removed, if the landlord wants them gone

Fit out, services and fittings

  • Partitions and joinery removed or left, as agreed in writing
  • Redundant data and power cabling removed by a licensed contractor where required
  • Lights working, with failed tubes and globes replaced
  • Doors, locks, handles, blinds and window furnishings working and undamaged
  • Any service reports the lease requires, such as for air conditioning, obtained

Kitchens and bathrooms

  • Appliances removed or cleaned, as the lease says
  • Benches, cupboards, sinks and splashbacks cleaned and repaired
  • Bathrooms cleaned in detail, with fittings working

Handover

  • All rubbish and left behind items removed
  • Full end of lease clean, from floor to ceiling, including windows and glass
  • Dated photos of every room
  • Keys, access cards and remotes counted and returned
  • Final sign off received in writing from the right party

The disputes to avoid

Pre existing damage

Use the move in condition report and photos to show damage that was there before you. Without them, it is your word against the landlord's.

Fair wear and tear

The SBDC notes that tenants are generally not responsible for structural repairs or damage through fair wear and tear, but each lease varies, so check yours.

Who signs off

Tenants sometimes get sign off from the agent while the landlord believes the lease has not been met. Check who has the final say and get it in writing.

Bond or bank guarantee

Agree a date for the final inspection and for the return of the bond or bank guarantee before you start.

Trades in shopping centres

Centre management may need to approve trades and see safety paperwork before they come on site.

If you cannot agree with your landlord, the SBDC's commercial tenancy advisers and dispute resolution service offer free help on 133 140.

Records to keep after you hand back

Keep a make good file until the bond or bank guarantee is back and any dispute period has passed:

  • The lease, the make good clause and any written agreement about what could stay
  • The move in condition report and photos
  • Quotes, invoices and completion photos for every trade
  • Any service reports the lease required
  • Your record of keys, cards and remotes returned
  • The written sign off and the bond or bank guarantee release

One contractor or several

A make good usually involves a handyman, a painter, a carpet cleaner and a cleaner, each with their own quote and their own dates. When one runs late, the others wait. Putting the whole job on one program, with one contractor responsible for the order of work, saves time and avoids work being done twice. If you are relocating, the same applies at the new office, where touch ups, a builders clean and your first week of cleaning need to be ready for day one.

Office make good Perth

Handing an office back?

We review your make good clause and the landlord's schedule, walk the premises with you, and give you one fixed written quote covering repairs, painting, carpets and the end of lease clean. We will schedule work after hours where needed, and each stage is recorded with photos in SiteIQ for your handover. See office relocation and make good in Perth, or our end of lease cleaning.

Sources

General information about Western Australian law and practice, current at 19 November 2026. For advice on your own lease, check the current lease and guidance or speak with a lawyer.

Questions

Office make good: common questions

What does make good mean at the end of an office lease?

Make good is the work needed to hand the premises back in the condition your lease requires. It commonly covers removing signage and tenant fixtures, patching and repairing walls and ceilings, repainting, cleaning carpets and floors, fixing damage and a full clean.

Do I have to repaint the office?

Only if your lease requires it, but many leases do, regardless of the condition of the walls when you moved in. Check the make good clause before you plan the work.

When should make good work be done?

During the lease term. Works carried out after the lease ends can lead to disputes about when it actually ended, and the landlord may charge additional rent and outgoings.

Can I leave my fit out in place?

Sometimes. A landlord may be happy to keep partitions, ceilings or floor coverings you installed. Ask early and get the agreement in writing, with a date for their reply.

Who signs off the make good?

Check the lease to see whether final sign off sits with the landlord or the agent, and get it in writing from that party before you hand back the keys.

Where can I get free advice on a make good dispute?

The Small Business Development Corporation offers free commercial tenancy advice and a dispute resolution service for WA businesses on 133 140.

Talk to Cameron Facilities

Call 08 6154 0910, email [email protected] or request a proposal online. Our office in Mount Lawley is open 9am to 5pm Monday to Friday, Perth time, and our help desk is available 24/7.

Talk to Cameron Facilities

Tell us about your site and what you need covered. Integrated facilities management across Perth and regional Western Australia, from a single building to a whole portfolio. Send this and a person will come back to you.

Prefer to talk it through? Call 08 6154 0910 or email [email protected].